East Branch Railway Line: A new bridge was constructed and the railway line was installed. The line is 36 km long, between the start of the branch point on the Al-Fardan/Rafah line, in addition to a distance of 12,500 km in the yards and four switches inside Port Said. Installation work has been completed for a distance of 35 km, and the project is currently underway.